Our Portfolio — Since 2009

Projects That
Define Our Craft

Every installation tells a story — the client's vision, our engineering, and the satisfaction that follows.

500+ Projects
15+ Years
50+ Clients
4 Cities
Scroll

What We've Built

Our Signature Projects

A curated look at our most impactful deliveries — real requirements, real results, real satisfaction.

Infosys BPM Ltd.
Chennai Campus
 Chennai, TN
HVAC
Central VRF Air Conditioning — IT Campus
2024
Client Requirements
  • VRF system for 1.2 lakh sq ft campus
  • BMS integration with existing SCADA
  • Energy efficiency below 0.9 kW/TR
  • Noise level under 45 dB in work zones
  • Commissioning within 90 days
What We Delivered
  • Dunham Bush VRF, 4 floors, 80 IDUs
  • Full BMS/SCADA with live dashboard
  • Achieved 0.84 kW/TR — 6% above target
  • Sound-attenuated ducting, 42 dB avg
  • Delivered in 78 days — 12 days early
9.8/10
Satisfaction
"KMEP delivered ahead of schedule with zero punch-list items. The energy savings alone paid back 30% of project cost in year one. Exceptional engineering discipline."
— Facilities Head, Infosys BPM Chennai
Electrical
HT/LT Installation — Auto-components Plant
2024
Client Requirements
  • 2 MW HT/LT infrastructure from scratch
  • Zero-downtime phased energisation plan
  • Full TNEB compliance and EB approval
  • Dedicated UPS circuit for CNC machines
  • Lightning protection across 8-acre plant
What We Delivered
  • 11 kV HT panel, LT MCC, 6 DBs
  • Phased energisation — 0 production stops
  • TNEB approval secured in 45 days
  • 200 kVA online UPS, 30-min backup
  • Franklin rod protection, 98 m radius
9.5/10
Satisfaction
"The phased energisation was flawlessly executed. Our production line never stopped once. KMEP's electrical team clearly understands industrial environments deeply."
— Plant Manager, Mahindra Tier-1 Supplier, Hosur
Mahindra Tier-1
Auto Supplier
 Hosur, TN
Aurobindo Pharma
Trichy Unit
 Tiruchirappalli, TN
Turnkey MEP
GMP Clean Room MEP — Pharmaceutical Facility
2023
Client Requirements
  • ISO 7 & ISO 8 clean room HVAC
  • HEPA H14 filtration ≥99.995% efficiency
  • USFDA 21 CFR Part 11 validation
  • Pharmaceutical-grade WFI/PW plumbing
  • Full MEP turnkey within 5 months
What We Delivered
  • AHU with HEPA, pressurisation cascade
  • DOP-tested H14 filter banks — validated
  • 21 CFR BMS with full audit trail
  • 316L SS WFI loop, TOC <500 ppb
  • Completed in 4 months 18 days
10/10
Satisfaction
"First-pass USFDA validation — zero observations. KMEP understood our regulatory requirements better than our internal team expected. Truly remarkable execution."
— VP Engineering, Aurobindo Pharma Trichy
Plumbing
STP / WTP & Firefighting — Residential Township
2022
Client Requirements
  • 300 KLD STP for 500-unit township
  • Recycled water for flushing & landscaping
  • TNPCB consent to operate
  • Hydrant, sprinkler & wet riser system
  • Gravity-fed scheme — no booster pumping
What We Delivered
  • MBBR-based 300 KLD STP, BOD <10 mg/L
  • Tertiary treated water reuse — 60% saving
  • TNPCB CTO first submission — zero violations
  • 4-zone firefighting, 45-min reserve tank
  • Gravity feed from 20 m OHT — zero pumps
9.7/10
Satisfaction
"TNPCB clearance on first submission — unheard of in our experience. The gravity-fed design eliminated recurring pump maintenance costs. KMEP truly thinks long-term."
— Project Director, Casagrand Builder, Chennai
Casagrand Builder
Pvt. Ltd.
 Chennai, TN

Start Your Project

Ready to Elevate Your Next Project?

Connect with KMEP to explore how integrated MEP expertise can transform your infrastructure.